National Grid Gas Transmission Network Strategy Solution: NetStrat

National Grid Gas Transmission (NGGT) own, manage and operate the UK high-pressure gas national transmission system (NTS). The NTS is a gas superhighway that connects the UK, balancing supply and demand on a day-to-day basis to make gas available when and where it is needed - providing heat to around 80 per cent of the UK’s 28 million homes.

Business Modelling Associates (BMA) worked with NGGT to develop an advanced systems model of the NTS network using an innovative combination of optimisation and hydraulic modelling approaches to inform future network design. This is enabling NGGT to develop a robust 25-year network strategy, which is resilient in the face of future uncertainty. The model is already identifying areas of asset redundancy, efficiency and initial pathway opportunities for low and zero-carbon gas transformation.

National Grid Gas Transmission Network Strategy Solution: NetStrat Case Study
PDF Icon PDF Icon

Download Case Study

Download Case Study

Please complete the form below to download the National Grid Gas Transmission Network Strategy Solution: NetStrat Case Study

Get in Touch!

BMA helps companies visualise, analyse and optimise their key decisions. Let's talk about how we can help you to make the best decisions for your business.

Contact the BMA Team